Reduce Total Installed Cost (TIC)
“…on-site
assembly and installation time was reduced by 75 percent.”
- Brian Wedin
When evaluating wiring systems for your power requirements, it’s important to consider the Total Installed Cost,
not just your material cost. With BradPower modular power systems, the total installed cost can be reduced
from 20% - 50% vs. conventional hard-wiring.
BradPower systems offer faster installation and commissioning, requiring:
 |
 |
No tools |
| |
 |
No pipe bending |
| |
 |
No wire pulling |
| |
 |
No conduit or raceways required |
| |
 |
Minimized troubleshooting |
|